Span is the chord between the springing points. Rise is the height of the crown above the springing line. A rise of half the span is a semicircular arch; the rise is limited to that. Ordinates are measured up from the springing line at set distances from the centre line.
Radius–
Arc length–
Span / rise–
Centre below springing–
Arch elevation
Setting-out ordinates from the centre line
| x from centre | y above springing | from springing end |
|---|