Invert depth = ground level minus the bottom inside of the pipe at the start. Cover = ground to the top of the pipe. Flow is the peak you expect in the pipe (a bathroom group is often about 0.5 to 1.5 L/s).
Fall–
End invert–
Velocity–
Flow depth–
Long section
Pipe section
Checks
Invert levels RL, m
| Point | Chainage | Ground | Invert | Cover |
|---|