Cut & FillSloping plot? Set the four corner levels and the building pad. Get cut, fill, the balanced pad level and how many truckloads of earth leave or arrive, with contours and a live section.

SheetT-18
MethodGrid volumes
Unitsm / m³
By@smart_tools_every_week
⬇ Download this appFree. One HTML file that works offline. Open it in any browser, no install or sign-up.More free tools →

Swell: dug earth takes up more room in the truck than in the ground. Shrinkage: fill compacted in place takes less room than it did in the ground. So a pad at the average ground level does not balance, and a cut of 100 m³ fills more than 10 trucks of 10 m³.

Cut (in ground)–
Fill (compacted)–
Balanced level–
Truckloads–

Plan

Section A–A

Pad level options

Pad level mCut m³Fill m³Off site (loose) m³Truckloads