OpeningWidth mHeight mWall
Set a width or height to 0 to remove an opening. Walls A and C are the room length, B and D the width.
Plaster area–
Cement–
Sand–
Paint–
Walls unfolded
up to 0.5 m²: not deducted0.5 to 3 m²: deduct onceover 3 m²: deduct, add reveals
Working IS 1200 measurement, step by step
| Step | Value | How |
|---|
Openings which rule each one falls under
| Opening | Area | Rule | Deduct | Reveals |
|---|